Bricks n balls 116
What can be the potential risk factors for workers on the construction site?įollowing are the risk factors for workers, for not following the safety protocols:ĥ3.
BRICKS N BALLS 116 FULL
According to IS Code, Full Strength of Concrete is achieved after?Ĥ6.
The Expansion in Portland cement is tested by…Ĥ5. The Normal Consistency of Portland Cement?Ĥ4. Number of Bricks used in 1 Cubic meter of Brickwork?Ĥ3. A First Class Brick Should Absorb Water More than?Ĥ2. Read More: Thumb Rules For Civil EngineersĤ1. What is the extra length in Bent up bars? Ring and ball test is conducted on which construction material?ģ8. Which Test is conducted to determine the bearing capacity of Soil?ģ6. Minimum Bars in Circular Column Should be_ģ5. Instrument used for level work on a construction site?ģ1. Read More: 7 Brick Test To Decide Quality Of Bricksģ0.
BRICKS N BALLS 116 FREE
Maximum Free fall of concrete allowed is_? One kilonewton is equal to _ kilogramsĢ8. What is unit weight of 25 mm Steel BarsĢ7. In Residential Building, Average Value of Stair Width?ġ6. What is the Volume of 50 kg bag of cement?ġ5. In Fe – 415 Steel Grade, 415 indicates the_of Steel.ġ4. What is the Unit weight of 12 mm Steel Bars.ġ3. What is the mix ratio for M – 20 Grade of concrete?ġ1. Read More: What Is Civil Engineering – History, Scope & Top 25 Universitiesġ0. If the concrete cube fails in the strength test, I will conduct a core cutter test on concrete and send a report to higher authorities. What do you do if any concrete cube fails in 28 days compressive strength test? Which is the equation used for calculating the unit weight of the steel bar?ĩ. Steel on-site?īy multiplying the length of the steel bar with its unit weightħ. How do you calculate the weight of 12m long and 10mm dia. With the help of a dumpy level, we can take up 5mm accurate reading or minimum reading.Ħ. What is the accuracy of the dumpy level or minimum reading we can take? I will check the level on the construction site by Spirit level, Dumpy Level, and Leveling Pipe.ĥ.
BRICKS N BALLS 116 HOW TO
How to do check level on construction site?
Why Concrete Cover is provided for reinforcement?Ĭoncrete cover for reinforcement is required to protect the rebar against corrosion and to provide resistance against fire.Ĥ. For Example – 1m x1m x1m = 1 m³ of volume of concrete.ģ. The volume of concrete is calculated by Multiplying its Length, Width, and Thickness together. How do you measure the volume of concrete? There are different steps involved in Building construction like,Ģ.